70 ft. , Steel (1995/2023)
Listing # 12105QC
| Type de coque | Acier |
| Longueur (LOA) | 70 ft. |
| Largeur | 22 ft. |
| Projet | 12 ft.0 in. |
| Année de construction | 1995 |
| Construit par | Chantier Naval Forillon Ltd. |
| Tonnes brutes | 83 |
| Vitesse maximale | 9 |
| Vitesse de croisière | 8 |
| Reconstruit | 2023 |
| Expiration de l'ICS | 2028 |
Capacités |
Hold Capacity: 40000 lbs of RSW Fuel: 10000 litres of Diesel Freshwater: 800 gallons |
Propulsion |
Main Engine: 630HP, Caterpillar C-18 Diesel Engine Built: 2013 Transmission: Finnoy (2016) G-45 Gear Ratio: 4.09:1 Shaft Size: 5" |
Moteurs auxiliaires |
Cummins (2023) - 55 KW Electricity
Cummins (2023) - 55 KW Electricity plus spare hydraulic system
|
Équipement de sécurité |
2-person life raft (10) life jackets (7) survival suits (4) fire extinguishers |
Hébergement |
(11) berths (3) cabins Electric stove Washroom Shower Furnace Refrigerator Microwave Freezer |
Électronique |
Radar: (2) Furuno Plotter: (2) Furuno Sounder: Hondex HDX-121, Furuno FCV-295 VHF: (1) AutoPilot: Simrad AP-60 GPS: Furuno GP-39, Furuno RD-33 VMS (Black Box): (1) Alarm System: Maretron Ship Management System Koden AIS Transceiver |
Équipement de pont |
Crab hauler (2) stabilizer winches Steel mast Stabilizer fins Hydraulics have been redone in 2022 Heila crane (HLM 3/2S) |
Commentaires |
Complete refit ($1.6 mill in 2022): RSW, hydraulics, (2) generators, shaft, bearings and Maretron System |
Prix |
$2,500,000 CAD | $1,826,000 USD |
** Les informations données sont censées être correctes mais ne peuvent être garanties **